October 12, 2012 at River Stone on the Dnieper embankment a grand feast «Fire Show in River Stone» - Opening of the first phase of construction - the first three houses on the Dneprovskaya naberezhnaya Str., 14. At the event were invited investors complex, politicians, businessmen and media representatives. Fireworks show over the Dnieper, was a gift from River Stone not only guests of the festival, but many people of Kiev, which saw a stunning fireworks display from different points of the city (http://riverstone.com.ua).
MaxiBud Engineering Ltd. acted complex installation of ventilated facades using porcelain tiles and glass constructions on the first stage of the object «River Stone».
About the project
Location: Kiev, metro station "Osokorki", Dneprovskaya naberezhnaya Str, 14
Developers: architectural workshop "Center of Contemporary Architecture", Architect - Yuriy Baranov
General Contractor: Construction Company "Miskzhitlobud"
Home facade work: April 2011
End facade works: November 2012
Facade area: 45,000 sq.m.
Number of homes: first place - 3 homes
Storey residential buildings: 23 floors
Types of work:
design, assembly, production, installation transparent structure and ventilated facades.
The materials used are:
Aluminum system of ventilated facades "MaxiAl"
Stoneware plate 600 * 600mm "Pavigres" (Portugal)
Transparent structures "Reynaers" (Belgium)